Projects of wooden houses with a boiler room. Houses from a bar with a boiler room

  • 03.03.2020

The company "Russkaya Stroechka" manufactures and inexpensively erects turnkey houses from a bar with a boiler room in the Central and North-Western regions of the Russian Federation. These are functional and practical one-, two-storey buildings made of environmentally friendly, natural material... The presented catalog contains 4 projects of houses with a boiler room.

Typical projects, implemented more than once in practice, allow you to accurately calculate construction costs and quickly get the finished result. If necessary, minor adjustments can be made to the finished project in order to adapt it to the individual requirements of the customer.

We offer our clients to buy a house made of timber of natural moisture (for shrinkage) or chamber drying. In the first case, you can additionally save up to 20% of the cost of the house, in the second, you can build a house immediately ready for use. We have our own woodworking production, so the price of the material is affordable for most of those who wish.

The profiled timber is delivered directly to the construction site. The form of payment is convenient for customers: 70% of the total price is paid after delivery of the material, 30% - upon completion construction works and putting the facility into operation.

Advantages of houses with a boiler room

Projects of houses from a bar with a boiler room are chosen by those customers who value useful space and want to use it as efficiently as possible. Building a house with a boiler room has several advantages.

  1. The price of such a multifunctional building is much lower than the cost of building a house and a boiler room separately.
  2. Maintain boiler room equipment, especially in winter time years, easier and simpler if the room is adjacent directly to the residential block.
  3. Due to the ergonomic design of the building, you can free up space in the local area and use it for other purposes.

The company "Russkaya Stroechka" has been on the domestic market for more than 5 years. Clients trust us, and we guarantee the quality of both material and construction work. Get advice and Additional information about cooperation, you can contact our specialists by toll-free phone. We are ready to start construction without delay!

A warm home where you can spend time with your family is what developers want when they choose a housing project for themselves for years to come. It is for them that we offer projects of houses with a boiler room. This room for placing heat generators allows you to competently and without extra costs organize heating of the building with any of the available energy resources.

The houses we offer from a bar with a turnkey boiler room are developed taking into account all building codes and safety regulations. Each type of boiler room requires knowledge and consideration of all the nuances of design. For example, gas boilers require a certain volume of the room, its height, the presence of exhaust ducts and supply grilles.

Boiler room requirements

Boiler houses in the proposed projects are designed taking into account all the requirements for the placement of equipment. For example, the premises in which gas, solid fuel or liquid fuel boilers will be installed must have the following characteristics:

  • The height of the room from floor to ceiling is chosen so that it is at least 2.5 m.
  • The volume of the technical room must be at least 15 m3. This is taken into account in the design and selection.
  • The boiler room must be fenced off from adjacent rooms by walls with a standardized fire resistance of 0.75 hours.
  • The windows are designed so that the glazing area is not less than 0.03 m2 per 1 m3 of the boiler room volume.
  • In our boiler rooms, ventilation is necessarily provided in a standardized volume, namely at least three times the air exchange per hour. In this case, an inflow of the same volume as the exhaust must be organized, as well as an additional amount of air for fuel combustion.

If projects are being developed for houses from a bar with a boiler room for placement thermal equipment of a different type, all its parameters are calculated taking into account the regulatory documents for these units.

Do you need a house with a boiler room?

Timber houses require special attention when designing boiler rooms. That is why it is better to order projects of such buildings from experienced specialists, such as our designers. We will develop an individual project for you for any requirements, and also offer you ready-made projects of houses for permanent residence with a boiler room of any number of storeys and layouts.

To order a suitable project for yourself, contact our specialists by contact phone numbers or through the form feedback and you will be offered the optimal development for your requirements. You can also choose your favorite project in the catalog on the site. Please note that any of the finished projects can be reworked to suit individual requirements.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the customer's family, a solution was proposed to move the terrace.
    foundation: based on geology and the architect's calculations, the house was erected on a pile-grillage foundation.
    floors: basement - solid concrete; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are made to order, with one-sided lamination, on-site assembly.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered, finishing elements made of wood, made on site, based on TK-visualization, painted. Plinth lined decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as a basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - after all, such unusual and stylish solutions it is always a professional challenge!
    We have prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in the colors of the project. Additional accents are highlighted by the professional timber imitation dyeing and color matching.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an already existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was just such a difficult task. They had a foundation from an old burnt-out house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a project was made that took into account the old layout, but had a new modern shape with interesting innovations! At the house appeared entry group, where you can sit at a table on cozy evenings and a difficult but possible exploited roof in our strip. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, bonded roofing and much more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth plastered walls with painted planken detailing, personality added by wood beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colours depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section of suburban architecture in the high-tech style, in the style chosen by courageous Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for life, which will perfectly fit into their difficult narrow area! With the advent of children, it was decided to make the dream come true, children grow up quickly and in their own house in nature there are many opportunities and Fresh air... We, in turn, were happy to work on an individual project for a house in classic style red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: to evaluate the order and construction processes, storage of materials on the site, to get acquainted with the construction team, to make sure of the quality of the work. After visiting the facility, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement -zhb floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, laying on mortar ??? Windows inserted.
    roof: metal tiles
    terrace: rough enclosing elements are made, flooring is made.

    What was done

    Dmitry contacted our company with an interesting draft design to calculate the cost. Our experience allows us to carry out such calculations for draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the construction cost, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team has begun to perform a difficult and expressive country project with spacious rooms and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roof. Also, for Dmitry, the exact timing of construction was important, in order to speed up the construction processes, the team was reinforced with 2 experienced bricklayers.
    The box on the pile-grillage foundation was delivered on time! The result pleased us and the customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company, Inkerman, was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was erected on a reinforced pile-grillage foundation.
    floors: wooden wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated basalt insulation in 200mm; interfloor overlap with noise insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, laying on mortar. Windows inserted.
    roof: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color scheme proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of a house with exterior decoration and then work on interior decoration! The frame technology was chosen as energy-saving, pre-fabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work on our construction site and the workers who gave a detailed excursion! We also worked out the estimate for a long time, combining different variants finishes, comparing their cost. This made it possible to choose the best option from a wide variety finishing materials and complete sets.
    The project was created by a friend of the architect, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - the USP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are set thanks to the powerful eaves of the roof, the interfloor belt and large windows!

    What was done

    When you decide to become the happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and, most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home... He liked the Avignon project and was already on the site strip foundation... After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change and adapt the project to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with external finishing by the spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were with our work. This is an individually designed Avignon project implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good man! Andrey Rumyantsev came to our company with a desire to build a one-story spacious country house with a fireplace for warm family evenings instead of an old country house ... The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior finish is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and solid. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing - warmth, affordable, beautiful, reliable. Modern technologies we have made such a step forward that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and patio were proposed, taking into account the cardinal points of the Customer's site.
    foundation: on the basis of geology and the architect's calculations, the house was erected on a pile foundation.
    floors: basement - solid concrete; interfloor - wooden on beams with 150 mm soundproofing device.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are custom made with one-sided lamination, on-site installation.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered. Based on the visualization, the facade panels under the Tolento stone have been added. The enclosing elements of the terrace, balcony are made of wood, made on site, based on the technical specification visualization, painted. The eaves of the roof are lined with soffits in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "brought to life according to his idea and sketch!"

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up twice! After all, to work on a new stylish project it is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use in this case? Vladimir bought a plot with picturesque views of the Oka River! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to have a rest in nature in wooden house, but it was necessary to build a house in a short time and the ideal solution for such tasks was frame technology construction! If you are to be different, then in everything! The house was made even more spectacular by a vertical finish imitating a timber made of durable larch, painted in natural shades with an emphasized wood texture. Complement modern look at home - laminated windows! It turned out to be a great country house, with a twist and at the same time incredibly functional.

    It all started with an individual project found by the Customer's family on a European website. It was with him that she first came to our office. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and the work began to boil! The architect improved and adapted the project for the site and the customer's family; the foreman "planted" the house on the site. On the fact of geological surveys, it was decided to put the house on bored piles. The frame has grown in a few weeks, then the roof, insulation, exterior decoration! Per winter period a house has grown on the site. The customer invited a third-party technical supervision, who monitored the process independently of our multi-stage control. The color of the color scheme for painting imitation of a bar was selected by our manager and here we have a bright and cozy country house of the Pushkov family's dreams!

Efficient heating is one of the most important characteristics of any home, so Dachny Season is ready to offer services for the design and construction of houses with a boiler room. Our experts are ready to provide you with housing, where you can independently regulate the temperature depending on the weather.

Features of houses with a boiler room

The main feature of a house with a boiler room is the presence of a separate room intended for placing boiler equipment in it. At the same time, the room itself is designed taking into account certain requirements established regulatory documents... The rest of the layout of a house with a boiler room is no different from ordinary residential cottages. It also has living rooms, a kitchen, a bathroom and other premises.

The presence of a boiler room in a private house gives whole line advantages to its owner:

  • Simple maintenance and repair of boiler equipment
  • The ability to independently regulate the temperature in the house
  • Easy access to all controls of the boiler equipment

It is also worth noting that the boiler room is attached to the house or brought out to separate room, provides more high level safety than when the boiler and other equipment are located directly in the basement or on the basement.

Houses with a boiler room from the "Dachny Season" company

The Dachny Season company offers services for the design and construction of houses with a boiler room. By contacting us, you get the following benefits:

  • We carry out turnkey construction of houses
  • All houses are guaranteed for a period of 10 years
  • Our experts are ready to carry out redevelopment absolutely free
  • All types of work are carried out by the company itself
  • Our prices are lower than those of competitors in Moscow and the Moscow region

We are ready to develop for you a project of a house with a boiler room, which will take into account all your wishes, as well as the norms established for this kind of structures.

Houses from a bar with a boiler room are created for winter use. The presence of a special combustion room indicates that it is good project specially prepared for year round living.

The boiler room can be located both in a one-story cottage and on the basement floor. It depends on the wishes of the customer, the chosen project and the preferred heating system.

Where should the boiler room be located?

In most layouts country cottages the furnace is located on the first floor. This is due to the fact that the lion's share of thermal heating schemes involves a reinforced circuit on the ground floor. The second floor is not heated so intensively, and is often completely devoid of heating.

A properly designed boiler room must comply with all technical requirements, and be responsible not only for heating, but also for heating water.

Often, a bathroom and a toilet are located near the combustion room in order to provide a strong pressure of water.

What should be placed in the boiler room?

When ordering a turnkey building, you need to understand which units and devices should be in the furnace. The optimal list looks like this:

  • Boilers.

They can work on coal, gas, wood briquettes and biofuels. For heating a cottage from a profiled bar, both mono-boilers (operate on one type of fuel) and combined solutions are suitable. They are capable of processing several different sources energy.

  • Devices for heating running water.

These are usually electric boilers. Less often gas water heaters of various capacities.

  • Capacity for water.

A large tank in which heated water accumulates. Usually its capacity does not exceed 150-200 liters. This is enough for 2-3 people during the day. The water in such a container can remain hot for a long time.

In addition, filters for coarse water purification, hydraulic separators, various piping elements, shut-off valves and an electrical panel are installed in the furnace.