Pedestals for porcelain washbasins 640x215x200 in size. Optimal bathroom sink sizes: tips for choosing

  • 13.06.2019
Home > Abstract

Pedestals for wash basins, semi-porcelain and porcelain, size 640x215x200, 670-630x240-180 - installation work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III- 4-80* "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 13449-82 "Sanitary ceramic products. Test methods", GOST 30493- 96 "Sanitary products ceramic types and main dimensions", "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.05.01-85 ( 1988, amend. 1 2000), GOST 13449-82, GOST 30493-96, "SNiP 2.04.01-85* Installation of toilet bowls with a tank directly attached - installation work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization building production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 13449-82 "Sanitary ceramic products. Test methods", GOST 30493-96 "Sanitary ceramic products types and main dimensions", "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III -4-80*, SNiP 3.05.01-85 (1988, amended 1 2000), GOST 13449-82, GOST 30493-96, "SNiP 2.04.01-85* installation are carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 13449-82 "Sanitary ceramic products. Test methods", GOST 30493-96 "Sanitary ceramic products types and main dimensions", "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III -4-80*, SNiP 3.05.01-85 (1988, amended 1 2000), GOST 13449-82, GOST 30493-96, "SNiP 2.04.01-85* Installation of faucets for bathtubs and trays. Faucets for showers installations with a shower net on a flexible hose - installation work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 13449-82 "Sanitary ceramic products. Test methods", GOST 30493-96 "Sanitary ceramic products types and main dimensions", "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III -4-80*, SNiP 3.05.01-85 (1988, amended 1 2000), GOST 13449-82, GOST 30493-96, SNiP 2.04.01-85* taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3. 05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 13449-82 "Ceramic sanitary products. Test methods", GOST 30493-96 "Ceramic sanitary products types and main dimensions", "SNiP 2.04 .01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.05.01-85 (1988, as amended 1 2000) , GOST 13449-82, GOST 30493-96, "SNiP 2.04.01-85* Laying sewer pipelines from polyethylene pipes high density with a diameter of 50 mm - work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 22689.2-89 "Polyethylene sewer pipes and fittings for them. "SNiP 2.04.01-85 * "Internal water supply and sewerage buildings "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.05.01-85 (1988, as amended 1 2000), GOST 22689.2-89, SNiP 2.04.01 -85* Laying of sewage pipelines from high-density polyethylene pipes with a diameter of 100 mm - work is carried out taking into account the requirements of SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4- 80* "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems", GOST 22689.2-89 "Polyethylene pipes e sewer and shaped parts to them. "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.05.01-85 (1988, as amended. 1 2000), GOST 22689.2-89, SNiP 2.04.01-85* Laying of sewage pipelines from pressure polyethylene pipes of low pressure of medium type with an outer diameter of 110 mm * at the outlet - work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80 * "Safety in construction", SNiP 3.05.01-85 (1988, amended 1 2000) "Internal sanitary systems ", GOST 22689.2-89 "Polyethylene sewer pipes and fittings for them. "SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.05.01-85 (1988, as amended. 1 2000), GOST 22689.2-89, SNiP 2.04.01-85* Laying of heating and water supply pipelines made of steel electric-welded pipes with a diameter of 100 mm * case - work is carried out taking into account the requirements of SNiP 2.04.05-91* "Heating, ventilation and air conditioning", SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80* "Safety in construction", GOST 10704-91 "Steel electric-welded longitudinal pipes. GOST 5264-80" Manual arc welding. Connections are welded. main types, structural elements and dimensions." steel electric-welded pipes with a diameter of 150 mm * case - work is carried out taking into account the requirements of SNiP 2.04.01-85* "Internal water supply and sewerage of buildings", SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Safety labor in construction" SNiP III-4-80* "Safety in construction", GOST 10704-91 "Steel electric-welded longitudinal pipes. GOST 5264-80 "Manual arc welding. Welded joints. Basic types, structural elements and dimensions." SNiP 2.04.05-91*, SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, GOST 10704-91, GOST 5264-80 Section 2. Construction work Manual excavation of soil in trenches up to 2 m deep without fastenings with slopes, soil group 2 - work is carried out taking into account the requirements of SNiP 3.02.01-87 "Earthworks, and bases and foundations", SNiP 3.01.01-85 * "Organization of construction production »; SNiP 12-03-2001 "Labor safety in construction", SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.02.01-87, SNiP 3.01.01-85*, SNiP 12-03-2001 Backfilling manually trenches, sinuses of pits and pits, soil group 2 - work is carried out taking into account the requirements of SNiP 3.02.01-87 "Earth structures, and bases and foundations", SNiP 3.01.01-85 * "Organization of construction production"; SNiP 12-03-2001 "Labor safety in construction", SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.02.01-87, SNiP 3.01.01-85*, SNiP 12-03-2001 Laying steel water pipes with a pneumatic test with a diameter of 200 mm * case - work is carried out taking into account the requirements of SNiP 2.04.05-91* "Heating, ventilation and air conditioning", SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80* "Safety in construction", GOST 10704-91 "Steel electric-welded longitudinal pipes. GOST 5264-80" Manual arc welding. Connections are welded. Main types, structural elements and dimensions. reinforced anticorrosive bitumen-rubber or bitumen-polymer insulation on steel pipelines with a diameter of 200 mm - work is carried out taking into account the requirements of SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III- 4-80* "Safety in construction", SNiP 3.04.01-87 "Insulating and finishing coatings", SNiP 3.04.03-85 "Protection of building structures and facilities against corrosion", SNiP 3.05.01-85 "Internal sanitary technical systems", SNiP 3.05.03-85 "Heat networks", SNiP 3.05.04-85 (1990) "External networks and water supply and sewerage facilities", SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 12 -03-2001, SNiP III-4-80*, SNiP 3.04.01-87, SNiP 3.04.03-85, SNiP 3.05.01-85, SNiP 3.05.03-85, SNiP 3.05.04-85 steel pipes with a diameter of 100 mm - work is carried out taking into account the requirements of SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80* "Safety in construction", SNiP 3.04 .01-87 "Insulating and finishing coatings", SNiP 3.04.03-85 "Protection of building structures and structures from corrosion", GOST 10704-91 "Steel electric-welded longitudinal pipes. Assortment", GOST 5264-80 "Manual arc welding. Connections welded. Main types, structural elements and dimensions.", SNiP 2.04.01-85 * "Internal water supply and sewerage of buildings" SNiP 3.01.01-85 *, SNiP 12-03-2001, SNiP III-4-80 *, SNiP 3.04.01-87 SNiP 3.04.03-85 SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80* "Safety in construction construction", SNiP 3.04.01-87 "Insulating and finishing coatings", SNiP 3.04.03-85 "Protection of building structures and facilities against corrosion", GOST 10704-91 "Steel electric-welded longitudinal pipes, GOST 5264-80" Manual arc welding . Connections are welded. Main types, structural elements and dimensions.", SNiP 2.04.01-85* "Internal water supply and sewerage of buildings" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 3.04. 01-87, SNiP 3.04.03-85, GOST 10704-91, GOST 5264-80, SNiP 2.04.01-85* Laying of asbestos-cement pipes with a connection using asbestos-cement couplings with a diameter of 100 mm - work is carried out taking into account the requirements of SNiP 3.01.01 -85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" SNiP III-4-80* "Safety in construction", SNiP 2.04.01-85* "Internal water supply and sewerage of buildings", SNiP 2.03.09-85 (1988, amended 1988) "Asbestos-cement structures", GOST 1839-80 (1997) "Asbestos-cement pipes and couplings for non-pressure pipelines. TU." SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP III-4-80*, SNiP 2.04.01-85*, SNiP 2.03.09-85 (1988, amended 1988), GOST 1839-80(1997) Oil painting of metal surfaces of steel beams, pipes with a diameter of more than 50 mm, etc., number of colors 2 - work is carried out taking into account the requirements: SNiP 3.04.01-87 "Insulating and finishing coatings", SNiP 3.01. 01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.04. 03-85 "Protection of building structures against corrosion", SNiP 3.04.01-87 "Insulating and finishing coatings", GOST 30884-2003 "Oil paints, ready for use". Any surface finish paintwork materials is produced in accordance with the current technological requirements for the use of specific materials and systems, the work is carried out on a prepared dedusted and degreased surface. The work uses modern materials. SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.04.03-85, SNiP 3.04.01-87, GOST 30884-2003 brick walls for pipes manually with a wall thickness of 0.5 bricks - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP ll-22-81 "Stone and reinforced masonry structures", SNiP 3.03.01-87 "Bearing and enclosing structures". Such types of work are carried out for the subsequent use of such holes for the purpose of laying plumbing equipment, plumbing pipelines or other structures. SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP ll-22-81, SNiP 3.03.01-87 concrete ceilings 100 mm thick holes with an area of ​​up to 500 cm² - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP ll-22-81 "Stone and reinforced masonry structures", SNiP 3.03.01-87 "Bearing and enclosing structures". Such types of work are carried out for the subsequent use of such holes for the purpose of laying plumbing equipment, plumbing pipelines or other structures. SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP ll-22-81, SNiP 3.03.01-87 concrete walls 100 mm thick holes with an area of ​​up to 500 cm² - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP ll-22-81 "Stone and reinforced masonry structures", SNiP 3.03.01-87 "Bearing and enclosing structures". Such types of work are carried out for the subsequent use of such holes for the purpose of laying plumbing equipment, plumbing pipelines or other structures. SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP ll-22-81, SNiP 3.03.01-87 electric lighting Section 1. Installation work Shields mounted on the wall with expansion dowels, shield weight, kg, up to 6 * - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General requirements safety". When installing electrical installations, the requirements of ST SEV 3230-81, GOST 12.1.004-91, GOST 12.1.013-78, GOST 12.1.019-79, GOST 12.1.030-81, GOST 12.1.038-82, GOST 12.3.003-86, GOST 12.3.009-76, GOST 27321-87, GOST 27372-87, SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03 -99 Part 13, GOST 12.3.032-84* 2001, ST SEV 3230-81, GOST 12.1.004-91, GOST 12.1.013-78, GOST 12.1.019-79, GOST 12.1.030-81, GOST 12.1 .038-82, GOST 12.3.003-86, GOST 12.3.009-76, GOST 27321-87, GOST 27372-87 Shields mounted on the wall with expansion dowels, shield weight, kg, up to 40 * - work is carried out taking into account the requirements : SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work" , GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements" When installing electrical installations, the requirements of ST SEV 3230-81, GOST 12.1.004-91, GOST 12.1.013-78, GOST 12.1.019-79, GOST 12.1.030-81, GOST 12.1.038-82, GOST 12.3.003-86, GOST 12.3.009-76, GOST 27321 -87, GOST 27372-87SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99 Part 13, GOST 12.3.032-84* 2001, ST SEV 3230- 81, GOST 12.1.004-91, GOST 12.1.013-78, GOST 12.1.019-79, GOST 12.1.030-81, GOST 12.1.038-82, GOST 12.3.003-86, GOST 12.3.009-76 , GOST 27321-87, GOST 27372-87 Luminaire with l.l. separately installed on pins with up to 4 lamps in the luminaire - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises . General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Luminaire with l.l. suspended ceilings mounted on pendants, the number of lamps in the luminaire is up to 4 - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises . General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85 *, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03- 99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Lamp with l.l. separately installed on pins with the number of lamps in the lamp 2 - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 " Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99 , GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Luminaire with l.l. separately installed on suspensions (rods) with the number of lamps in the luminaire 2 - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06 -85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85 *, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12- 03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction TVE", SNiP 3. 05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85 *, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12 -03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Luminaire with L.N. with hook suspension indoor with normal conditions environment - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03- 99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lights for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001 , GOST 8607-82 (2004), GOST 15597-82 (2003) Luminaire with l.s. ceiling or wall mounted with screws for rooms with normal environmental conditions, single-lamp - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05. 06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12 -03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Luminaire with sodium lamp on walls, columns and trusses, including control gear installation - work is carried out taking into account the requirements: SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3 .05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lighting fixtures residential and public buildings. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99 GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) Searchlight, separately installed on a steel structure on the wall of a building, with a lamp with a power of up to 500 W - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 " Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work", GOST 12. 3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises. General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General technical conditions "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85 SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597- 82 (2003) Illuminated wall signs * "Pozhhydrant" - work is carried out taking into account the requirements: SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 8607-82 (2004) "Lamps for lighting residential and public premises . General specifications", GOST 15597-82 (2003) "Lights for industrial buildings. General specifications" SNiP 3.01.01-85 *, SNiP 12-03-20 01, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 8607-82 (2004), GOST 15597-82 (2003) hidden wiring- work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST R 51324.1-2005 "Switches for household and similar stationary electrical installations" SNiP 3.01.01-85*, SNiP 12- 03-2001 SNiP 3.05.06-85 -85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work", GOST 12.3.032 -84 * 2001 "Electrical installation work. General safety requirements", GOST R 51324.1-2005 "Switches for household and similar stationary x electrical installations "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST R 51324.1-2005 hermetic - work is carried out taking into account the requirements: SNiP 3.01.01-85 * "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03- 99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST R 51324.1-2005 "Switches for household and similar stationary electrical installations" SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST R 51324.1-2005 Box with a step-down transformer * - work is carried out taking into account the requirements: SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction" , SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical installation work", GOST 12.3.032-84* 2001 "Electrical installation work. General safety requirements", GOST 30030-93, GOST 50571-14-96 "Electrical installations of buildings. Part 7. Requirements for special electrical installations", GOST 50571-21-2000 "Electrical installations of buildings. Part 5. Selection and installation of electrical equipment", GOST 50571-19-2000 "Electrical installations of buildings", GOST 22789-94 "Complete low-voltage devices. General technical requirements and test methods "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 30030-93, GOST 50571- 14-96, GOST 50571-21-2000, GOST 50571-19-2000, GOST 22789-94 Drawer box or distribution box for pipe wiring, size, mm, up to: 200x200 - work is carried out taking into account the requirements: SNiP 3.01.01- 85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work", GOST 12.3.032- 84* 2001 "Electrical work. General safety requirements", GOST 30030-93, GOST 50571-14-96 "Electrical installations of buildings. Part 7. Requirements for special electrical installations", GOST 50571-21-2000 "Electrical installations of buildings. Part 5. Selection and installation of electrical equipment", GOST 50571-19-2000 "Electrical installations of buildings", GOST 22789-94 "Complete low-voltage devices. General technical requirements and test methods "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 30030-93, GOST 50571-14-96, GOST 50571-21-2000, GOST 50571-19-2000, GOST 22789-94 Vinyl plastic pipe according to established structures, along walls and columns with fastening with brackets, diameter, mm, up to 50 - work is carried out taking into account requirements: SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work ", GOST 12.3.032-84* 2001 "Electrical installation works. General safety requirements", GOST 30030-93, GOST 50571-14-96 "Electrical installations of buildings. Part 7. Requirements for special electrical installations", GOST 50571-21-2000 "Electrical installations of buildings. Part 5. Selection and installation of electrical equipment", GOST 50571-19-2000 "Electrical installations of buildings", GOST 22789-94 "Complete low-voltage devices. General technical requirements and test methods "SNiP 3.01.01-85*, SNiP 12-03-2001, SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 30030-93, GOST 50571-14-96, GOST 50571-21-2000, GOST 50571-19-2000, GOST 22789-94 Vinyl plastic pipe according to established structures, along walls and columns with fastening with brackets, diameter up to 25 mm - work is carried out taking into account the requirements: SNiP 3.01.01-85* "Organization of construction production", SNiP 12-03-2001 "Labor safety in construction", SNiP 3.05.06-85 "Electrical devices", SNiP 12-03-99 Part 13 "Electrical work", GOST 12. 3.032-84 * 2001 "Electrical installation work. General safety requirements", GOST 30030-93, GOST 50571-14-96 "Electrical installations of buildings. Part 7. Requirements for special electrical installations", GOST 50571-21-2000 "Electrical installations of buildings. Ch .5. Selection and installation of electrical equipment", GOST 50571-19-2000 "Electrical installations of buildings", GOST 22789-94 "Complete low-voltage devices. General technical requirements and test methods" SNiP 3.01.01-85 *, SNiP 12-03-2001 , SNiP 3.05.06-85, SNiP 12-03-99, GOST 12.3.032-84* 2001, GOST 30030-93, GOST 50571-14-96, GOST 50571-21-2000, GOST 50571-19-2000, GOST 22789-94

This additional element of the bathroom today is very popular among the population, because. is an integral part of the design of various interiors of a modern bathroom.

Pedestals allow you to hide various communications, and also decorate the bathroom, because. has an elegant shape, a beautiful faience, porcelain or ceramic structure and a variety of colors that can be matched to any interior.

Often the pedestal and the sink are sold as a single set, but today the option is widespread when it is offered to the buyer separately, because. is an independent element of decor, bathroom decoration and performs other functions.

Characteristics of pedestals

The pedestal for the sink is the leg located under it. It can be in the form of a vase, a cylinder, a parallelepiped, a drop, etc. There is also a semi-pedestal that does not stand on the floor, does not have a back panel, but is attached to the wall, hiding the siphon and pipes.

Thanks to such a support or pedestal, the bathroom space is not visually overloaded with plumbing and sewer communications, and the space of a small room is also significantly saved.

Our online store offers a wide range of faience, porcelain and ceramic pedestals made by manufacturers from Russia, Germany, Italy, Spain, Sweden, Switzerland, Turkey and other countries.

The sink and the leg to it must be made of the same material. Also, it must match the sink in size, shape, color, decor, location, i.e. harmonize with her. Therefore, the sink is selected first, and then the pedestal.

On our website you can buy a pedestal:

  • white;
  • beige;
  • green;
  • red;
  • blue
  • black color.

When purchasing a pedestal for a sink, be sure to measure the height above the floor on which this sink is attached, so that later you do not have to completely redo the entire structure and decorative trim bathroom walls and floors.

Buying furniture and plumbing equipment is not an easy process, as it may seem at first glance. In order for the acquisitions to harmoniously fit into the interior, as well as to be easy to use, their choice must be approached with all responsibility. Especially when it comes to arranging a bathroom or bathroom. These rooms can be decorated in any style and have a different area, but they must definitely be functional and accommodate everything. necessary fixtures. That is why the size of the bathroom sink plays a major role when choosing it.

Before buying a washbasin, it is recommended to draw a drawing of the bathroom to scale. It is necessary to mark all the items that are planned to be placed in the room. Including the sink itself. A visual diagram will help determine the dimensions of the washbasin and the success of its location.

First of all, you should think about the width of the sink. The convenience of its operation depends on this parameter.

Washbasins can be divided into several types:

  • Compact (35 - 45 cm). Designed for rinsing hands, because. normal washing in such a sink is difficult. Most often, small structures are installed in a bathroom or a small bathroom.
  • Standard (50-65 cm). This width does not allow splashes of water to scatter throughout the room. Suitable for standard size bathrooms.
  • Wide (65-90 cm). A great option for a spacious restroom.
  • Extended (from 90 cm). Such washbasins are most often double designs designed for simultaneous use by several people. Suitable only for large rooms.

Having decided on the width of the sink, you should pay attention to another important parameter - the height.

Washbasin dimensions: choose the height of the location

The height of the sink should ensure comfortable hygiene for all family members. The problem with the choice may arise due to the fact that people living in the house have different heights. In this case, you will have to stop at the average, which is considered to be optimal for both men and women.

80 - 85 cm - the height at which experts recommend installing a washbasin. In this case, the upper part of the mirror (or wall cabinet) should be located at a distance of 190 cm from the floor level.

If only adults live in the house big people, the level of plumbing can be higher. However, it does not make sense to “lift up” the structure if there are persons in the apartment who have different heights. For babies, it is recommended to install a children's washbasin (low). If this is not possible, a small chair should be placed next to the sink to make using the equipment comfortable for them as well.

For people of different sexes, the ideal washbasin height is somewhat different:

  • 95 - 100 cm - for men;
  • 80 - 95 cm - for women.

You can achieve the ideal height by installing a special washbasin model. For example, by attaching a suspended structure using brackets. You can also purchase a washbasin with a cabinet: some types have adjustable legs, thanks to which the height of the washbasin changes by 7-10 cm.

The size of the bathroom sink with or without a cabinet: choose the depth

The depth of the washbasin is another important parameter that determines whether the use of sanitary equipment will be comfortable. For example, with a small value of this parameter, water splashes will scatter throughout the room.

Speaking about the depth of the sink, one of two parameters is implied:

  • Distance from the edge of the washbasin to the wall;
  • The height of the bowl.

If the distance to the wall is taken as the depth, the optimal indicator will be a value from 48 to 62 cm. The recommended height of the bowl is from 13 to 15 cm.

Determine if a sink is ideal given parameter possible without the help of a tape measure. It is enough to lean against the washbasin and extend your arm parallel to the floor. If the back wall of the structure is at the level of the fingers or the middle of the palm, this model is the comfort standard.

Everything required dimensions can be found in technical passport equipment. It's easy to decipher them. For example, in the entry 550x480x150, the first number indicates the width of the product, the second parameter indicates the distance to the wall, and the last one indicates the depth of the bowl.

Sink pedestal: sizes and variety of models

Having opted for a washbasin with a pedestal, you should pay attention to the size of the entire structure, which consists of the size of the bowl and the height of the legs. It is best to purchase this model in a store in order to be able to take a closer look at the display case. The height of the pedestal varies from 60 to 85 cm depending on the manufacturer.

The dimensions of the legs are written in three numbers. For example, in the designation 640x215x200, the first value indicates the height of the column, the second and third indicate its length and width. If you have any questions when deciphering the parameters, you should contact the seller for help.

This is extremely important: extra centimeters will not allow plumbing to fit in the room.

The pedestal for washbasins is most often made of the following materials:

  • Faience. Affordable, but least resistant to mechanical damage product. However, if the faience tulip sink is used carefully, the design will last for many years.
  • Porcelain. It has high performance indicators, which explain the significant cost of this material. A porcelain washstand will not crack if a heavy object falls on it.
  • Semi-porcelain. It is a mixture of components. Semi-porcelain washbasins are less durable, but also quite durable.

Pedestal sinks have many non-standard models that will not only decorate the bathroom, but also allow you to optimally arrange the necessary sanitary ware in small room. For example, washbasins in the form of shells, which are distinguished by their sophistication of form, are very popular.

Another original solution: the purchase of a bathroom and a sink in the form of an oval irregular shape. Position the plumbing in such a way that the narrowed ends of the structures are on top of each other. The dimensions of this equipment may be higher than standard, but the room will not seem cramped and cluttered.

How to determine the dimensions of the bathroom sink (video)

When choosing a washbasin, one should rely not only on aesthetic preferences, but also on the dimensions of the structure. This is especially true for non-standard models, because even the most compact shells do not always fit harmoniously into the room. The washbasin is the most important piece of equipment in the bathroom, so you need to consider all the parameters when buying. And remember that first of all it should be comfortable, not fashionable or fancy.

When choosing washbasins, buyers focus on appearance and the shape of the product, the method of fastening, the material of manufacture. But an important role is played by the presence of a pedestal.

Washbasin dimensions

If you need a high-quality washbasin with a pedestal, immediately specify the dimensions of both the washbasin itself and the stand. The parameters are written in the order: height-length-width. That is, a pedestal for a porcelain washbasin can be specified in the size 640x215x200. This means that in front of you is a pedestal for a washbasin, 640 mm high, and its length and width are respectively 215 and 200 mm.

High-quality plumbing in a wide variety and at the best prices is presented on the specialized website of the Kolo company in the catalog at the link: http://www.kolo.ua/%D0%BF%D1%80%D0%BE%D0%B4%D1%83 %D0%BA%D1%82%D1%8B/umyivalniki-i-pedestalyi/pedestalyi-i-polupedestalyi/ .

Washbasin width

If you want the bathroom to look harmonious, all plumbing should be matched according to style and size. When choosing sinks, for example, you should focus on the width of the product. Modern washbasins with pedestals are presented in the range from 35 to 100 cm. If we talk about corner options, they indicate only one side of the product, which is located along the wall. The universal width is 55-65 cm.

If the size of the room is small, people sometimes sacrifice the width of the sink. As a result, the products are less than 50 cm. Practice shows that this is inconvenient to use. Water splashes fall outside the sink. Models wider than 65 cm are suitable for spacious baths.

Washbasin height

This parameter is sometimes used to indicate the depth of the sink bowl. The normal figure is from 13.5 to 15 cm. The deeper the sink bowl, the less splashes go beyond it.

For men, the optimal washbasin height is from 94 to 110 cm, for women it is suitable from 81 to 92 cm. In general, a value from 86 to 93 cm is considered optimal.

Washbasin depth

This parameter determines the distance from the edge of the washbasin to the wall. As a rule, the depth of comfortable washing should be at least 48 cm and not more than 61 cm. You can check whether the sink is suitable for you even without a tape measure. It is enough to stand close to the washbasin and stretch your arms over it. If the back wall ends at the level of the fingertips, or in the middle of the palm, the product fits perfectly. You can buy it without hesitation and doubt.

Choosing a quality washbasin for the bathroom, following the above tips, will not be difficult.