Hot water is turned off: why, for how long, where to call. How long can hot water be turned off? Turning off hot water - prospects for the future

  • 14.06.2019



Planned life, everything you need for a comfortable life is at hand: water, light, and warmth in winter. Gas as needed. City dwellers may seem lucky, no longer needing to fetch water, heat with a stove, or read under a kerosene lamp. But public Utilities require constant attention, so the schedule for turning off hot water in Moscow in 2017 and at the address again requires close attention.

The water is turned off due to the debugging of the system, preparing it for the next heating season. Fortunately, the authorities are trying to warn their citizens in time. When will it happen? When and for how long should you go without hot water?

Shutdown Schedule

The heating season is an integral part of Moscow life, especially in an unpredictable climate, when there are days in winter and -20, -30, with snowfalls, icy winds and other joys of cold weather. People are saved only by uninterrupted heating, which depends on the supply and supply system hot water. It requires an annual check, repair as needed. Such inspections concern the whole of Moscow, no matter whether old residential buildings have been renovated or brand new ones.




MIPC, Russia's largest specialized heat and power company, is responsible for providing water, responsible for a total of 70,000 individual buildings, which include both residential and industrial buildings. And MIPC clients are 95% of all residents and guests of Moscow.

To find out in advance when and how much water will be turned off, you need to study schedules that are approved and drawn up in advance. Then they are posted, acquainting everyone through the official website from MIPC.

It has already been announced to the press service that the shutdown of water in general will begin as early as May 12. In law hot water can be disabled for a maximum of 14 days. To find out the date for a specific address, you need to use a simple search for your county or street.




How to search by county:

First, select your district from the available list (there is a complete list of all Moscow districts in general);
Then find your street;
Choose the number of your house from the available ones on it.
On the street:
In the search box, start typing the name of your street slowly, spelling it out. Next, a list will open, find your street;
Enter the next house number.

The result will be the date of official shutdown, followed by the date of inclusion.




Why do you need to turn off the water at all

Shutdown of water has already become habitual for Muscovites, because it happens every year. Moreover, it concerns not only the capital, but also the regions of the country. Such a measure is necessary as part of general preventive work. All hydraulic tests will be carried out, it exerts pressure on sections of the pipeline - 24 atmospheres. They will quickly identify all the “weak or problematic” places, which can then cause some kind of emergency.

Of course, it is worth identifying and fixing problems in the spring, than suffering and repairing everything in the winter. Otherwise, people will be left without the heating they need in cold weather.

MIPC explains the shutdown of water as a measure necessary to prepare for the next heating season. By the way, the shutdown dates can be found out not only through the site. MIPC has a hotline where, having given the address, it is easy to get the necessary information.




The schedule is usually drawn up at the beginning of each year, then published in the spring, in advance, so that people have time to prepare. Most often, hot water supply can be turned off from May to August, the main period for prevention and possible repairs. After all, September 1 is the date of delivery and the end of preparation.

prospects

However, MIPC is trying to reduce the "waterless" time ordinary people. For example, in the USSR, water (hot) was turned off for a month at all. Then the period was slowly reduced. From 4 it became 3 weeks, then 2. Today the officially announced deadline is 10 days, moreover, some houses may get off with 2-3 days.

The authorities are reassuring citizens that if there is suddenly no water for more than 14 days specified by law, then this is a good reason to apply for a recalculation.




Sometimes, of course, overlaps occur. MIPC justifies this by the scale of the work. After all, the metropolis is really huge, the length of its heating networks is 15,500 km, and there are more than 70,000 houses.

Luckily, replacing old pipes helps make maintenance easier. But the replacement is still underway, there are still many pipes left in the city that have been operating since the 70s. They require special attention.

Every year in Moscow, as in other cities of Russia, hot water supply is turned off. Since hot water is a guarantee of comfort, many people are interested in when this will happen in order to adjust their plans for these inconveniences.

When will the water be turned off?

Usually, water is not turned off in all the city, but gradually in different areas (neighborhoods, sections of several streets, and so on). All water cuts occur according to a pre-developed plan, so residents can adjust their plans if they wish.

Enter the address of the house to determine the date of turning off hot water in Moscow in 2018


Check out date

Since MIPC is engaged in the maintenance of water supply networks, you can see the schedule for turning off hot water in Moscow on the official website of the company. Please note that in rare cases there are slight deviations from the schedule if the planned work does not have time to complete on time. To see the hot water shutdown schedule for 2018 at the address of the house, follow the link.

How long does a shutdown usually last?

Lack of hot water delivers modern man a lot of inconvenience, so for many people the question of the duration of water outages is very relevant. Usually hot water is turned off for a period of 10 days. If hot water supply has not been restored within 2 weeks, you have the right to demand a revision of utility bills.

Often the water is turned off for only a few days. Refers to new areas where new pipes and other equipment used to provide hot water and heat to apartments have been installed. Checking the health of networks and their readiness for heating season in this case, it takes 3-4 days, although it may vary depending on the characteristics of the system and the area. As the number of new pipes and equipment increases every year, the turnaround time for many areas is reduced. But about 70% of communication networks in the capital are still Soviet-era.

Why turn off the water?

An annual shutdown of hot water is necessary to check the health of the networks and their readiness for the next season. Stop hot water supply for preventive maintenance. They necessarily include high-pressure hydrotesting, which makes it possible to identify weaknesses in pipelines. Eliminating faults and weaknesses reduces the risk of emergencies during the cold season.

Not only heating networks, but also heat exchangers, pumping and other equipment need regular maintenance. During the period of hot water shutdown, Maintenance and various preventive work that can prevent many troubles during the heating season.

“This year, shutdowns take place from May 10 to August 25,” AiF told Valery Maslov, Head of the Central Dispatching Office "MOEK". - There is an information service hotwater.moek.ru, with the help of which you can find out the duration of preventive maintenance and shutdown dates in specific buildings” (see infographic).

Experts are sure that it is impossible to abandon the traditional “cold season” altogether. Even in neighborhoods where houses were built just a couple of years ago.

Yes, there is nothing special to repair in the new buildings themselves, but the water comes there from the outside - through pipelines from thermal stations, boiler houses, which require repair and diagnostics (as a rule, hydraulic and temperature tests). So that later - when the cold comes - there will be no unpleasant surprises. Well, in the old housing stock, intra-house communications need only careful handling, and there you can’t do without annual shutdowns. By the way, not everywhere you have to “winter swim” for 10 days in a row: more and more often, prevention is completed a few days earlier.

According to Moscow's Deputy Mayor for Housing and Communal Services and Improvement Petr Biryukov, maintenance work is planned for 33,000 residential buildings this year.

What if it doesn't leak again?

If 10 days have already passed, and you continue to heat water with kettles and the managing organization is silent like a fish, complain to the gorod.mos.ru portal. Just keep in mind that in order to send a message, it is required to indicate the financial and personal account of the payer (you will find it in a single payment document). But don't worry - your message will appear in the public domain on the portal without this personal information.

To endure 10 days is not so difficult. But many citizens are annoyed by other - short-term - blackouts of hot or cold water. They happen without warning, or the ad appears late at night and the faucet is dry the next morning.

“If we talk about sudden accidents, then, as you understand, it is impossible to warn residents in advance (but information about what happened and when the problems will be resolved should be made public within the next 24 hours). But about any planned repair work Management Company is obliged to report in advance and not to shut off the water for more than 8 hours a month (see infographic), - AiF explained head of the commission on housing and communal services Public Chamber Moscow Alexander Kozlov. - Does it run more hours in a month? Residents have the right to recalculate!

Click to enlarge

There is another common situation - when the water in the entire entrance is turned off at the request of residents who are making repairs and want to connect new plumbing to the general house communications. Management companies are willing to meet them halfway (after all, this is a paid service), but they do not always remember the maximum allowable shutdown period and do not inform other residents. Tracking such violations is difficult, unless you have an HOA. Is there a resident association? So, there is someone to entrust the collection of information and proceedings with the house manager.

It became known the period and terms in which hot water supply will be stopped in connection with planned work. The schedule for turning off hot water is somewhat different for Moscow and for the region. The term of work will be 10 days, but for some areas it has been reduced to three.

Shutdown of hot water supply in Moscow

The hot water shutdown period will begin in May of this year. It will be completed by September. The planned shutdown of hot water will take place in Moscow from May 13, 2019 to September 1. The same period is also relevant for New Moscow. The term for stopping the hot water supply will not exceed ten days. For some areas, it will be limited to 3 days. In some homes, water shutdowns are not expected at all.

The schedule for turning off hot water at the address can be specified in the form at the beginning of the article, on the official website of the Moscow United Energy Company. Or call toll-free hotline which is available to citizens around the clock.

Notification must occur no later than 10 days before the start of work. The information will be constantly updated. Therefore, for individual districts and streets, it must be clarified during the period of preventive work.

In the form or on the MIPC website, hot water shutdown can be clarified for individual administrative districts of the capital and microdistricts.

Disconnection of hot water by district

In order to clarify the start date and termination date for the hot water supply for each individual district and microdistrict, it is necessary to select the administrative district from the drop-down list: SVAO, SZAO, VAO, ZAO, Central Administrative District, SEAD, SZAO SAO, SAO. Then determine the street and house number.

In the event that the schedule is not determined, this means that the object of interest is owned by another organization and the work schedule must be clarified directly with the Management Company.

The schedule is presented in full days. That is, the start from 00:00 of the specified date, the planned completion of work at 23:59 of the day indicated in the schedule.

Disconnection of hot water in the South Administrative District

At the beginning of May this year, it will be possible to get acquainted with the interactive list of addresses for the termination of hot water supply and the work schedule.

The list will include 16 districts. Including Biryulyovo, Chertanovo, Tsaritsyno, Orekhovo-Borisovo and others.

Shutdown of hot water in the North-Eastern Administrative Okrug

Termination of hot water supply in the North-Eastern Administrative District of the capital will also be presented in the form of an interactive list. Data on the schedule and timing of the work will be published by MIPC in the first days of May this year.

The list will include 15 districts. Among them will be Sviblovo, Maryina Roshcha, Otradnoye, Bibirevo, Rostokino and others. A detailed schedule for each district can be found separately.

Shutdown of hot water in the Moscow region

Termination of hot water supply in the Moscow region is somewhat different from the capital and may have its own characteristics. This is due to the fact that each of the municipalities sets its own rules and deadlines for the implementation of work.

So if the shutdown of water in Moscow in 2019 will be from 1 to 9 days for each site, then for regional cities the period can stretch up to 14 days. Detailed information on the schedule of work at the addresses can be clarified on the official websites of municipal administrations.

Shutdown of water in Zhukovsky

It is already known that the cessation of hot water supply in Zhukovsky will be carried out from May 16 to May 26. Hot water supply time is scheduled for 20:00. During this period, the equipment must be pressure tested, the defects in the heating networks have been identified and eliminated.

Turning off hot water in Khimki

You can get acquainted with the exact schedule of work on the official website of the Administration of the city district of Khimki. The period for the termination of water supply is tentatively scheduled from May 10 to August 20, 2019.

The list of boiler houses where preventive work will be carried out includes those that serve the microdistrict Ivakino, Planernaya, Podrezkino, Novogorsk and others.

Shutdown of hot water in Mytishchi

Work on the restoration of heating networks will be carried out by the Mytishchi Heating Network Company. All detailed information about the period of interruption of the water supply is located at the beginning of the article.

Here you can find the schedule for each street. They are sorted alphabetically with reference to the boiler room.

Shutdown of hot water in the city of Zelenograd

From May to the end of August 2019, work will be carried out in Zelenograd to restore heating networks. As a result, residential buildings will be disconnected from the supply of hot water. Maximum term work will be 10 days for each section.

You can find out the exact schedule at the addresses for the city of Zelenograd at the beginning of the article.

Shutdown of hot water in Balashikha

To carry out work in preparation for the heating season will be "Thermal networks of Balashikha". Detailed information on the timing and addresses of the termination of hot water supply can be found at the beginning of the article.

Shutdown of hot water in the city of Korolev

Science City Korolev will provide information on the timing and areas of preventive work as part of the notification of the population on the official website of the Administration.

More than 20 boiler houses are included in the list of those subject to preventive maintenance. These include Novye podpilki, Tekstilshchiki, Samarovka, Komitetsky forest, Alfa Loval, Suvorovskaya, Tarasovskaya and others.

Shutdown of hot water in the city of Zheleznodorozhny

A detailed schedule and addresses of the shutdown can be found on the website of the city administration or the Government of the Moscow Region. Up-to-date information on this issue will be provided no later than the first days of May of the current year.

The list for work will include more than 25 boiler houses. During the planned period of DHW shutdown, defects in heating networks should be identified and eliminated and they should be prepared for the upcoming heating season.

Disconnection of hot water in the city of Dolgoprudny

Accurate information on the schedule for shutting down the hot water supply will be provided by the City Administration. The term of the work will not exceed 14 days.

Scheduled outage will be indicated in the schedule full days, that is, from 00:00 on the start date to 23:59 on the end date.

Why is hot water turned off?

Turning off the water in the summer is a common occurrence. This is due to the need for preventive work in preparation for the heating season.

Hydraulic tests are carried out in boiler houses and heating networks. They are aimed at:

  • assessment of the quality of repair of heating networks;
  • detection of defects and elimination of the causes of heat loss.

Turning off the water is a necessary measure. Without it, utilities will not be able to conduct necessary work and tests. Therefore, without stopping the hot water supply, adequately prepare for winter period impossible.